BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Institute of Corrosion - ECPv6.15.20//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://www.icorr.org
X-WR-CALDESC:Events for Institute of Corrosion
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Europe/London
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20210328T010000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20211031T010000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20220327T010000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20221030T010000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20230326T010000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20231029T010000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Europe/London:20220222T180000
DTEND;TZID=Europe/London:20220222T195000
DTSTAMP:20260510T222856
CREATED:20210615T082433Z
LAST-MODIFIED:20220216T114817Z
UID:13026-1645552800-1645559400@www.icorr.org
SUMMARY:Aberdeen Branch Event - ICorr Technical Event
DESCRIPTION:Company/Speaker: Intertek Production & Integrity Assurance / Leo Richards\n\nRegistration for the Event Please click here for link: Webinar Registration – Zoom \nICorr Member or Non-Member Event is Free of Charge to attend. \nImplementation of Plan-Do-Check-Act review of an Onshore Oil and Gas Operator’s Corrosion Management Policy and Actions \nHSG-65 alongside the Energy Institutes Corrosion Management Guidelines were used as the basis for the audit of a large onshore Middle Eastern oil field. The purpose of the Study was to perform a detailed review of the corrosion monitoring and mitigation systems and to propose any required upgrades to ensure world class / excellent asset integrity performance. \nThe approach taken to the Study was to follow the UK Health & Safety Executive’s guidance for “Managing Health and Safety”\, HSG65 (2013)\, of PLAN-DO-CHECK-ACT\, which considers both Technical and Systems approaches associated with managing assets safely. This is a closed loop planetary model commencing with a high-level Corporate Policy for health and safety\, under which there is a Policy and Plan for managing corrosion and integrity. The model ends with lessons learned which feeds back into the corrosion and integrity Policy and Plan to ensure risks are managed to As Low As Reasonably Practicable (ALARP).\nThe study highlighted a distinct pattern in the working practices of the operator with virtually all of the sections of the corrosion management system being shown to have some form of Plan and Do however the implementation of a Check and Act stage was missing from virtually all aspects \nPlease see Flyer and Latest Programme of Events  \n 
URL:https://www.icorr.org/event/aberdeen-branch-event-icorr-technical-event-3/
CATEGORIES:Aberdeen Branch
END:VEVENT
END:VCALENDAR